Showroom em Ontario, Califórnia · Consulte o suporte para seu destino
SED-8-8-1XGF-C
Consultar
SED-8-8-1XGF-C
SED · SED-8-8-1XGF-C · Em destaque

SED-8-8-1XGF-C — Glass Bottle Beer Rinser-Filler-Capper Monobloc

A descrição completa deste modelo ainda está sendo traduzida. Consulte os detalhes em inglês ou solicite informações à nossa equipe. English

Glass-bottle beer rinser-filler-capper monobloc (SED-8-8-1XGF-C). Rotary 3-in-1 architecture with 8 rinsing heads (304 stainless spray rinsers, ~2-2.5 s contact time), 8 filling valves (CO2 counter-pressure isobaric fill

Prazo de entrega
Consultar
Capacidade de produção
800–1000 bottles/hour

Como funciona

Empty glass bottles enter the rotary monobloc through a star wheel and are gripped by 304 stainless clamps. In the rinsing zone 8 spray heads inject rinse water into inverted bottles for 2-2.5 s. Bottles are righted and transferred to the filling zone where the isobaric CO2 counter-pressure system pre-pressurizes each bottle, performs twin evacuation to remove air and reduce O2 pickup, then fills with beer at 110-150 mL/s via a level-controlled valve. The mechanical crank linkage raises and lowers the filling valve for smooth, precise engagement. After filling, bottles pass to the single crown-cap sealing station where caps are applied by a press head. A reject gate removes any bottle with an improperly seated crown (reject rate ≤0.2%). CIP circuits allow in-place cleaning of all product-contact paths.

Processo de funcionamento
1Empty glass bottles enter the rotary monobloc through a star wheel and are gripped by 304 stainless clamps.
2In the rinsing zone 8 spray heads inject rinse water into inverted bottles for 2-2.5 s.
3Bottles are righted and transferred to the filling zone where the isobaric CO2 counter-pressure system pre-pressurizes each bottle, performs twin evacuation to remove air and reduce O2 pickup, then fills with beer at 110-150 mL/s via a level-controlled valve.
4The mechanical crank linkage raises and lowers the filling valve for smooth, precise engagement.
5After filling, bottles pass to the single crown-cap sealing station where caps are applied by a press head.
6A reject gate removes any bottle with an improperly seated crown (reject rate ≤0.2%).
7CIP circuits allow in-place cleaning of all product-contact paths.

Especificações técnicas

Especificações da variante: SED-8-8-1XGF-C

Especificações

Modelo
SED-8-8-1XGF-C
Capacidade de produção
800–1000 bottles/hour
Tensão
380V 50Hz 3Φ
Potência
2 kW
Pressão de ar
0.6 MPa supply; fill pressure 0.2-0.4 MPa

Dimensões

Comprimento
2000 mm
Largura
1500 mm
Altura
2300 mm
Peso
1500 kg

Materiais

Materiais de contato
SUS304 aço inoxidável; high-grade acid-resistant stainless steel (CIP-compatible polished surfaces)
Materiais do corpo
SUS304 aço inoxidável

Características principais

Glass-bottle 3-in-1 rinser-filler-capper monobloc
8 rinsing heads + 8 filling valves + 1 capping head
CO2 counter-pressure isobaric filling, 110-150 mL/s
Twin evacuation reduces O2 pickup vs single-evacuation systems
Mechanical crank linkage for smooth, accurate positioning
Automatic flow, pressure, purge and spear-open detection with station alarms
Crown seal reject rate ≤0.2%
CIP-compatible product-contact paths
ABB main motor, Siemens PLC/HMI, Schneider electrical, Omron VFD, NSK main bearings
Twin-evacuation cuts O2 pickup vs. single-evacuation systems
Mechanical crank linkage gives smooth, accurate positioning
ABB main motor, Siemens PLC/HMI, NSK main bearings

Aplicações

Glass-bottle beer rinsing, filling and crowning
Carbonated beer filling line

Setores

Beverage
Brewery

Marcas dos componentes

Main motor
ABB
PLC
Siemens
HMI / touchscreen
Siemens
Electrical components
Schneider
VFD (variable frequency drive)
Omron
Main bearings
NSK
SED
Fale com SED Sales Team
Especialistas em equipamentos · contato pelo WhatsApp
Consulte o horário e a disponibilidade da equipe

Documentação

Ficha técnica (PDF)
Visão geral do equipamento, especificações e dimensões · Documento original (inglês)
Solicitar à equipe de vendas
Manual do operador
Instalação, operação e diagnóstico · Documento original (inglês)
Solicitar à equipe de vendas
Folha comparativa (Padrão e Econômica)
Comparação das configurações · Documento original (inglês)
Solicitar à equipe de vendas
Protocolos IQ / OQ / PQ
Documentação de validação para conformidade GMP · Documento original (inglês)
Solicitar à equipe de vendas
Protocolos FAT / SAT
Testes de aceitação na fábrica e no local · Documento original (inglês)
Solicitar à equipe de vendas
Desenhos CAD (STEP / IGES / DWG)
Desenhos de engenharia para a instalação · Documento original (inglês)
Solicitar à equipe de vendas
Certificados de calibração
Nível sonoro, resistência de terra, rigidez dielétrica e rugosidade · Documento original (inglês)
Solicitar à equipe de vendas
DQ (qualificação do projeto)
Protocolo completo de qualificação do projeto · Documento original (inglês)
Solicitar à equipe de vendas
Certificados de materiais
Composição do aço inoxidável 316L · Documento original (inglês)
Solicitar à equipe de vendas
SED
WhatsApp · Vendas SED
Contato comercial · WhatsApp
→