
SED-250P-A — Automatic ALU/PVC and ALU/ALU Blister Packaging Machine
Die vollständige Beschreibung dieses Modells wird noch übersetzt. Lesen Sie die englischen Details oder fragen Sie unser Team nach weiteren Informationen. English
SED-250P-A is a fully-automatic ALU/PVC and ALU/ALU blister packaging machine for capsules, uncoated tablets, sugar-coated tablets, big honey pills, injections, ampoules, surgical/medical instruments, and small electroni
Funktionsweise
PVC roll film is fed through a pre-heating box, then formed into blister cavities between upper and lower forming molds (heated to approximately 110/100°C plus encoder-controlled compressed air at 0.4–0.6 MPa). Material drops into the blister cavities through a brush or vibratory feeder. PTP aluminum foil from the second roll meets the PVC at the heat-sealing station (approximately 140–160°C). Batch number is embossed; tear lines are creased; stepper-motor traction advances the strip; the blanking mold cuts finished blister cards. PTP feeding and collecting devices use swing-arm sensors to keep tension constant. Heating molds automatically separate when the machine stops to prevent scalding film and extend mold life.
Technische Daten
Technische Daten
Abmessungen
Werkstoffe
Kompatibilität
Elektrik
Betrieb
Physikalische Angaben
Wesentliche Merkmale
Anwendungen
Branchen
Komponentenhersteller
Reinigung und Wartung
Wipe outer/inner machine surfaces with a clean wet towel before and after each shift; open the hood and wipe internal parts. Clean mechanical parts with detergent (alcohol). Use a dry cloth on the touch screen, signal lights, photoelectric sensor windows, and pressure switches. Clean the air filter at the inlet to remove moisture/dirt. Use clean dry cloth on cylinders/gas-spring rods, then apply a few drops of pneumatic oil. Do not disassemble valves — contact manufacturer. Lubricate transmission chain and adjustment knobs monthly with oil (0–35°C) or every 3 months with grease (>35°C / <0°C); grease all bearings twice per year; No. 30 mechanical oil quarterly. Dust the electrical control cabinet weekly.
